top of page

SUSTAINABILITY

From design, to development Fuga Home Designs ™ uses permaculture as approach to land management and settlement design that adopts arrangements observed in flourishing natural ecosystems. It includes a set of design principles derived using whole-systems thinking. Fuga Home Designs ™ is committed to creating sustainable housing with it’s vendors and clients. We are dedicated to having the least possible negative impact on our environment.

41777df0-b7c4-4a99-8526-2a7e25e93157.jpg
48ce443e-1ac0-4e06-b045-6a69d1265acd.jpg

This means energy efficiency, avoiding environmental toxins, and using materials and resources in a responsible manner while having a positive physical and psychological impact on its inhabitants. What we build matters, and so does how we build it. Building with sustainability in mind should be standard for a 21st century home. Building sustainable homes not only saves you money in the long run, but also reduces your impact on the environment. Fuga Home Design ™ is focused on striving to meet our 16 Point Sustainability Mission which is of the following. We encourage our clients and vendors to being committed to preserving mother nature.

15 POINT SUSTAINABILITY MEASURES

  • Our First Conversation
    You will have a lot of questions, so we will discuss the process from start to finish. Design, location, land options, lot size, property characteristics, surrounding agriculture, amenities, rental opportunities, budget, and everything else under the sun.
  • Preliminary Cost and Estimate
    We will prepare cost projections based on your concept and desired needs and provide payment structure plan.
  • Design Approval
    You can edit the title from the Settings tab in the app. If you don’t want to display the title, simply disable the Title under “Info to Display”.
  • Development Plans and Permits
    Each region of the country can vary case to case. But it is approximately 2-3 months to obtain your permits.
  • Accurate Budget Projections
    After approval you will be given a clear documented breakdown of cost and timeline.
bottom of page